Feb. 18th, 2025

tamidon: (Default)
I am so ready to explode into the new parts of the house. The team lead explained that I can't start putting down rugs and bringing stuff in because we have to wait for the inspectors. Technically we are supposed to wait for occupancy permission. Which is really hard to hear because it all looks ready to go. At least the sink is hooked up so I can wash up, and I'm using the appliances. Electrician needs to come back for one last thing, replacing the plugin for the dryer because he put the wrong kind in(team lead "the machine was right there, FFS") and a couple plumbing things, then we get to wait for the inspector.

Profile

tamidon: (Default)
tamidon

March 2025

S M T W T F S
      1
234567 8
9101112131415
16171819202122
23242526272829
3031     

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 6th, 2025 12:42 am
Powered by Dreamwidth Studios